The document attached in this section is intended to publicise the actions to be carried out from the point of view of the restoration of the natural area affected by the exploration and exploitation work done at the exploitation concessions of the category C of which exploitation rights belongs to the enterprise Magnetitas del Cehegín, S.L. and can be consulted by clicking here.

This document is part of the “Publication of the General Directorate of Energy and Industrial and Mining Activity, by which the restoration plan corresponding to the request for approval of the research project and restoration plan “Phase-II”, in 61 concessions for the exploitation of resources of section c), located in the municipality of Cehegín, made by the company Magnetitas del Cehegín”, as can be checked in the following link: https://www.borm.es/#/home/anuncio/21-01-2021/314

At an extractive industry, the approval of the restoration plan, is always a precondition for the granting of an investigation permit, or the exploitation authorisation, or after the revision or modification of the same by the exploiting entity, and is carried out in accordance with articles 5.5 and 7 of Royal Decree 975/2009, of 12 June, on the management of waste from extractive industries and the protection and rehabilitation of the area affected by mining activities (BOE No. 143, of 13 June 2009), following a previous report from the competent environmental authority.